Living rooms, bedrooms, kitchens, bathrooms and stairs — two side-by-side before-and-after pairs, plus rooms finished to the Brightroom checklist.
01 · Living room, before & after Throws folded, cushions plumped and set upright, magazines cleared from the coffee table, and the rug and wood floor vacuumed under the big windows.02 · Kitchen kit Our plant-based spray, a wooden scrub brush and colour-coded microfibre cloths, set out on a granite island before the sink, brass tap and cabinet fronts are cleaned.03 · Bedroom, before & after Bed made with the blue quilt and cream throw, pillows arranged, clothes lifted off the chair and the nightstand dusted around the lamp.04 · Herringbone oak living room Oiled oak floor damp-mopped with a wood-safe cleaner, the media unit and radiator dusted, and the sofa and sheepskin chair left neat.05 · Open-plan kitchen & dining Matte black counters wiped streak-free, the subway-tile backsplash and oven front cleaned, the dining table cleared and the large tile floor mopped.06 · Guest-ready bedroom Fresh white bedding, towels folded at the foot of the bed and the carpet vacuumed — a pre-hosting refresh ready for visitors.07 · Staircase Every tread vacuumed with a sealed-HEPA machine, leaving fresh lines, and the white painted stringers and skirting hand-wiped.08 · Bathroom Marble tub surround cleaned with a stone-safe, pH-neutral product, the chrome tap polished, and fresh towels folded on the ledge and rail.
The price includes 5 hours of extra work to change the colours, the font family and the font size, add or remove pictures and paragraphs, and add visual effects and other tweaks. The design is 100% finished before anything is paid. Guaranteed.