BenchmarkMotor Works Book a visit
Menu

Eight plates from the service bays

Brakes, suspension, engine parts, interiors opened for wiring access and the bench tools behind them. A well-kept bay reflects how carefully a car is treated, and every job here is photographed for its owner.

  • A brake disc and caliper on a wheel hub with the wheel removed, the studs and flexible hose visible.
    01 Rotor and caliper, measured with the wheel off
  • Brake pipes and flexible hoses being fitted and tightened along a car's chassis rail.
    02 Brake pipes and hoses, tightened to specification
  • A car interior with the steering wheel in place and parts of the dashboard removed during work.
    03 Dash panels removed for wiring access
  • A silver car door showing wear and surface damage part-way through restoration work.
    04 Door skin, wear recorded before repair
  • An old cast bench vice clamped to a workbench, its jaws open and its thread worn.
    05 Bench vice at the parts bench
  • An oil pump removed from an engine and photographed on a bench, its housing and drive visible.
    06 Oil pump removed and inspected
  • A car suspension assembly with the wheel and tyre still fitted, showing damage to the components.
    07 Damaged suspension and tyre, before repair
  • A car body panel being sanded back with a grinder in preparation for paint.
    08 Panel sanded back before paint

Start with a pinpoint diagnosis

Live readings first, photographed and sent to your phone, with an itemised quote agreed before a part is fitted.

Maintenance reminders, now and then

An email when a factory service interval is coming up or a recall affects a common model. No fixed schedule, and one link in every message removes an address from the list.

This is a demo design, not a real business.Make this design yours for $499 with EZWebee.
What the price includes
The price includes 5 hours of extra work to change the colours, the font family and the font size, add or remove pictures and paragraphs, and add visual effects and other tweaks. The design is 100% finished before anything is paid. Guaranteed.